Solutions · Construction
Run the whole project on one system: a true CPM scheduling engine, BoQ-to-billing with measurement books and variations, daily site control, and cost control with EVM — inside an ERP that already handles your deals, orders and procurement, connected to a B2B marketplace.
From setting up the project to the defects liability period, every stage feeds the next — the programme drives daily work, daily reports feed measurement, measurement fills the bill, and the same data powers earned value and cash-flow control.
Plan the programme
Build WBS and activities with real dependency logic, compute the critical path, and freeze a baseline — or import from P6, MSP or Excel.
Price and contract
Build or import the cost-coded BoQ, back rates with rate analysis, and manage variations at contract rates.
Execute and measure
Daily progress reports tagged to schedule activities, a measurement book for quantities, snags, RFIs and drawing control on site.
Bill and control
Raise progress bills filled from the measurement book, track retention, and watch SPI/CPI, commitments and cash flow in one place.
Construction Scheduling
A true CPM engine — dependency logic, float, critical path, baselines, retained-progress reschedule.
Learn more →Progress Billing
Measurement book to RA bill / pay application / IPC — certify, hold retention, get paid.
Learn more →Daily Site Reports
DPRs tagged to the schedule, and a Daily Brief that tells you by morning if the plan is at risk.
Learn more →Punch Lists & Snagging
Snags, RFIs, drawing revision control and DLP defect tracking through handover.
Learn more →BoQ & Rate Analysis
Cost-coded bill of quantities with component rate build-ups and variation management.
Learn more →Cost Control & EVM
Commitments, budget vs actual by cost code, PV/EV curves, SPI/CPI and EAC.
Learn more →Field & HSE
Plant, labour attendance, toolbox talks, inductions, incidents and permits.
Learn more →Daily Brief
Planned crew vs present, shortfall impact on the critical path, one-click re-plan.
Learn more →Construction vocabulary changes at every border — the product doesn't make you translate. Screens and documents use the terms your market uses.
Punch list = snag list
US punch list · UK/AU snag list · CA deficiency list
Pay app = RA bill = IPC
US payment application · India RA bill · FIDIC interim payment certificate
Change order = variation
US change order · UK/Commonwealth variation order
Scheduling, billing, site control and cost control on one spine — with procurement and a supplier marketplace already built in.